BMI LE CHANDLER
The project involves the construction of an office complex and a car park featuring a building with offices from the ground floor to the eighth floor, plus 4 basement levels with 439 parking spaces. The construction project was divided into separate packages, including carcassing, which was awarded to FAYAT IDF. This includes earthworks, decontamination, and demolition, as well as construction of a perimeter diaphragm wall around the property adjoining the buildings and an SNCF logistics hub. The construction work is top-and-down and includes dewatering.