IPC4 AT THE CUTTING EDGE OF TECHNOLOGY AND STANDARDS!
On the site of Institut Paoli-Calmettes (Provence-Alpes-Côte d’Azur regional cancer treatment centre), 4 in-patient units (80 beds) were built (design-construction), along with laboratories and medical offices, a 52-capacity staff childcare centre and a range of social, logistics and technical areas. A 250-space underground car park was delivered back in October 2017.
For this project, our teams achieved great technical feats to manage health risks, particularly aspergillosis: waterproofing of existing frontages and installation of a filtered air input system to make up for the lack of fresh air.
Congratulations to the teams on this successfully-delivered, major, new FAYAT BÂTIMENT project!