In Rennes, Espace Engineering is constructing a 13-unit residential building on a plot of just 361 m², within a dense urban environment. Surrounded by adjoining buildings and facing significant logistical and stormwater management constraints, the project requires carefully adapted site organisation and construction methods.

A construction project adapted to site constraints

The project involves the construction of a 13-unit residential building, comprising apartments ranging from one to four bedrooms, spread over seven storeys and one basement level, with a total floor area of 968 m².

Located at the heart of a dense urban fabric and surrounded by three adjoining buildings, the project presents significant challenges in terms of site organisation and logistics. The particularly restricted 361 m² plot has required construction methods to be adapted and a specific programme of works to be implemented, taking into account the limited floor areas as well as supply and circulation constraints on site.

For the structural works, the use of precast elements, including precast concrete wall panels, floor slabs, columns and beams, has provided an effective response to these constraints.

Prior to construction, asbestos removal was carried out, followed by the demolition of the existing building. Special foundation works were also undertaken to enable the construction of the new building within this constrained urban environment. The design also incorporates a basement accessed via a car lift.

Carré Oberthur à Rennes (35) : construire au cœur d’un site urbain contraint 2

Particular attention to stormwater management

The project’s location within the former riverbed of the Vilaine and within the boundaries of the Flood Risk Prevention Plan (PPRI) requires particular attention to stormwater management.

Specific measures were therefore incorporated into the project from the design stage to ensure effective water management on this plot within a dense urban setting. This consideration forms an important part of the building design, addressing both the hydrological characteristics of the site and the applicable regulatory requirements.