A technically demanding healthcare facility
The project involves the construction of a two-storey building (ground floor plus one upper floor), covering an area of 3,727 m² and designed to accommodate a leading veterinary clinic. The structural works include the installation of 118 micropiles for the deep foundations, ensuring the stability of the building on heterogeneous ground conditions. The vertical structures comprise high-rise precast concrete twin walls, featuring a specialised Pliolite® paint finish to ensure both long-term durability and aesthetic quality. The floors combine precast concrete floor plates and hollow-core slabs, providing an efficient and practical structural solution to meet the building's technical requirements, particularly in sensitive areas housing heavy medical equipment, including CT scanners, MRI scanners and operating theatres. Site operations were optimised to ensure smooth construction progress over a six-month period, involving a total of 1,124 m³ of concrete and 81 tonnes of steel.
A practical approach to environmental responsibility
With a strong commitment to construction quality, risk prevention and reducing environmental impacts, the project was carried out in accordance with the principles of the “Clean Construction Site” and “Safe Construction Site” approaches.

