Construction, extension and reorganisation of treatment areas
The works included the extension and refurbishment of the centre to accommodate a new-generation scanner and create additional treatment rooms and waiting areas.
The project included the construction of a hematite concrete bunker, with walls 1 metre thick and a 1.50-metre-thick floor slab, designed to meet stringent radiation protection standards. The complex geometry and the limited number of concrete pours required specific construction methods and the use of high-density concrete.
The 800 m² extension was delivered within a constrained urban environment, requiring careful management of site access alongside sensitive public roads and strict compliance with safety and nuisance regulations.
Completed over 10.5 months for a contract value of €3.7 million excluding VAT, the works also included the vertical extension and reorganisation of the existing centre to optimise circulation flows and waiting areas.
A rigorously managed construction site
Careful management of site access, parking and traffic on the surrounding public roads helped minimise disruption while ensuring strict compliance with regulatory requirements relating to safety and the surrounding neighbourhood.
These measures contributed to more efficient use of resources while maintaining continuity of operations and ensuring safety throughout the works.