Extension et restructuration du collège des Ponts-Jumeaux à Toulouse 1

Extension and restructuring of Ponts-Jumeaux secondary school in Toulouse (31)

  • SEG-FAYAT Toulouse
  • SEG-FAYAT
  • Enseignement

Carried out on an occupied site, the extension and restructuring of Ponts-Jumeaux secondary school demonstrates the ability of SEG-FAYAT, a Fayat Bâtiment subsidiary, to combine technical performance, continuity of operations and high environmental standards. Delivered under strict phasing constraints, the project incorporates low-carbon construction solutions and a particularly comprehensive circular economy approach.

A construction project in the heart of an urban area

The project involves increasing the school's capacity through an extension and the complete restructuring of the existing buildings, while maintaining uninterrupted school activities. The works are organised according to a strict phasing schedule aligned with school holidays, with intervention periods limited to two weeks for the most disruptive operations. This approach involves installing temporary insulated partitions, reorganising circulation routes and scheduling demolition works exclusively during periods when the school is unoccupied.

Extension et restructuration du collège des Ponts-Jumeaux à Toulouse 2

The extension, constructed in an area separated from the teaching facilities, will accommodate approximately 100 additional pupils and includes new specialist classrooms and a covered outdoor area. At the same time, the internal restructuring optimises the existing floor space and includes a dedicated classroom for pupils with disabilities.

Extension et restructuration du collège des Ponts-Jumeaux à Toulouse 3

The project also involves the complete transformation of the school's catering facilities, which are now designed to prepare 400 meals per day on site, compared with 250 previously. This increase in capacity is accompanied by the reconfiguration of technical areas and equipment to meet current functional and performance requirements.

The external works complete the development with the installation of permeable surfaces, landscaped green spaces and facilities designed to support everyday use, as part of an alternative stormwater management approach aimed at improving the overall environment.

A project focused on low-carbon construction and the circular economy

The project stands out for its high standards in resource management and environmental impact reduction. The construction site has achieved a 94% waste recovery rate, significantly exceeding the initial target of 88%. This performance is based on systematic waste sorting at source, with dedicated recovery and recycling streams for construction rubble, timber and metals, enabling these materials to be reintegrated into production cycles. Construction rubble is directed towards recycling facilities for the production of new concrete, while timber and steel are fully recycled.

Extension et restructuration du collège des Ponts-Jumeaux à Toulouse 4