Le Kube

Le Kube: complete refurbishment of an office building with ambitious thermal performance targets

  • ESPACE ENGINEERING
  • Bureaux

Espace Engineering, a Fayat Bâtiment subsidiary, and ANB Architecture are responsible for the design and project management of the refurbishment of the “Le Kube” building, as part of a project aimed at enhancing the gateway into Pacé (35), near Rennes.

A comprehensive refurbishment driven by external thermal insulation

The project involves the thermal renovation of the building through the installation of external thermal insulation and new cladding.

The existing façade consists of three-dimensional precast concrete panels, which could not be thermally insulated while retaining the original architectural detailing. The solution therefore selected was an overcladding system combining flat metal cladding with open-jointed timber cladding.

All four levels, from the semi-basement garden level to the second floor, underwent a complete strip-out of the internal spaces, covering a total floor area of 1,313 m², to enable the office floors to be reconfigured for multi-tenant occupancy.

All external windows and doors are being replaced, with projecting brass-coloured surrounds creating a contrast with the anthracite cladding and adding an elegant, refined touch to the building.

The works also bring the building into compliance with accessibility standards for people with disabilities, including external access, the lift and sanitary facilities.

Outside, the ground is being excavated to create a terrace at garden level, providing the semi-basement floor with a pleasant and secluded outdoor space.

Le Kube

A sustainable approach embedded in the project

In addition to the significant improvement in thermal performance provided by the external insulation system, the refurbishment incorporates a number of strong environmental design choices.

As part of the external works, the existing road surfaces were removed and redesigned, with parking areas finished in permeable paving to encourage rainwater infiltration and reduce soil sealing.

The project also provided an opportunity to redesign all parking areas using the same type of surfacing, while incorporating EV charging points.