A technically complex project carried out on an occupied hospital site
The project includes a 1,430 m² extension involving extensive demolition works, the construction of an underground gallery and a ground floor, as well as the reinforcement of existing foundations using micropiles and shallow foundations. The floors are constructed using suspended reinforced concrete slabs, the structural walls in reinforced concrete, and the façade in insulated textured precast concrete panels with exposed grey concrete. The steel framework and metal structure are dedicated to the technical plant room, garage and SHED roof.
The refurbishment of the existing building includes the creation of new openings and the separation of patient, visitor and logistical flows, with dedicated routes adapted to different user groups (children, adults, psychiatric patients and detainees). The project is being carried out on an occupied hospital site in several phases: relocation of offices, construction of the eastern extension followed by the western extension, and finally restructuring of the existing facilities.
A responsible construction approach
The project complies with RE2020 regulations and follows an approach based on HQE principles. The use of low-carbon concrete for reinforced concrete elements and precast concrete panels helps reduce the building's carbon footprint while maintaining structural and thermal performance.