A comprehensive, future-focused facility
This redevelopment is one of the largest public construction projects currently underway in Antibes. It includes the demolition of the existing building and the construction of a new 5,600 m² complex.
This second phase of the future aquatic centre will include three pools, comprising a main 25 x 20 metre pool and two teaching pools, as well as a 500-seat spectator stand. It will also feature modern changing facilities, administrative areas, an underground car park and, above all, a 1,400 m² rooftop area.
The rooftop will include a restaurant and a fitness area, both accessible independently, with panoramic views over the sea.
A strong environmental approach
Designed in accordance with RE2020 requirements and certified BDM (Bâtiment Durable Méditerranéen), the project is firmly rooted in a sustainable construction approach.
The environmental measures implemented include 240 rooftop photovoltaic panels, the use of low-carbon concrete, and systems for the recovery and reuse of wastewater.

