Piscine braud 2

Refurbishment and extension of the Tournesol swimming pool in Braud-et-Saint-Louis

  • SEG-FAYAT
  • Culture, sports & loisirs

The refurbishment and extension of the Tournesol swimming pool in Braud-et-Saint-Louis, completed at the end of March 2025, marks a key milestone in the modernisation of local sports facilities. Awarded to Seg-Fayat, a subsidiary of Fayat Bâtiment, this public-sector design-and-build contract transformed an iconic 1970s facility into a modern, functional and environmentally responsible complex.

Major works for a modern and sustainable facility

The design-and-build project involved the complete refurbishment of the existing facility, together with the creation of new areas designed to meet users’ needs. The aquatic spaces were redesigned to offer a varied range of activities, with several indoor pools: a 25-metre sports pool, a learning and leisure pool, and a paddling pool for young children. Outdoors, a 25-metre heated pool and a splash pad complete the facilities.

A wellness area was also created to provide spaces for relaxation, including a sauna, steam room and hot tub.

The facility was designed to deliver high levels of energy performance, with an 80% reduction in CO₂ emissions per square metre of pool surface area. This performance is based on an optimised geothermal system featuring 500 linear metres of ground probes connected to a heat pump, covering 100% of cooling requirements and 65% of heating requirements. Energy efficiency is further enhanced through natural ventilation, carefully considered building orientation, and heat recovery from the air renewal and pool water treatment processes. Finally, 105 kWp of photovoltaic panels and a system for reusing pool renewal water for cleaning, toilets and irrigation further strengthen the project’s sustainable approach.

Innovative technical solutions for a complex project

The Seg-Fayat teams demonstrated their technical expertise in meeting the challenges of this complex project. The works began with earthworks, deep foundations using piles and micropiles, and structural works carried out simultaneously in two areas: beneath the dome and within the extension zone. These initial phases provided the structures required for the installation of the new facilities and the extension of the overall complex.

The use of stainless-steel pools required a high degree of precision in both construction and coordination. The simultaneous involvement of several specialist trades, including plumbing, HVAC, electrical systems, water treatment and waterproofing of the retained dome, was carefully coordinated to ensure the project remained on schedule. Commissioning was carried out in close collaboration with the client, who remained highly engaged with the project throughout its development.

Awarded the “Piscine de demain” (“Swimming Pool of Tomorrow”) label, the Les Héléades swimming pool stands out as an exemplary project combining innovation and sustainability. This national label recognises swimming pools that meet demanding criteria in terms of energy efficiency, sustainable water management and user comfort.

  • €12M

    Contract value excluding VAT

  • 25 months

    Design, preparation and construction works