Major refurbishment works on an operational industrial site
The project involved the restructuring of the Energy-from-Waste Plant and the creation of new functional facilities. These included a new access point on the south façade of the unloading bay to improve truck circulation and provide additional queuing capacity during peak periods, the construction of a fire-safety room and a PSR room for residual sodium products, as well as structural supports for heat exchangers.
The works were delivered as a macro-package covering all trades excluding the process equipment and specialist technical packages. A detailed phasing strategy ensured permanent access to the unloading pits while allowing the plant to remain fully operational throughout the works.
The project also included partial demolition and preparation of the existing concrete substrates, followed by structural works and partial façade renovation.
Façade renovation and compliance works meeting stringent environmental constraints
The project was completed in 2025 with the renovation of the façades, including cleaning and repairs to the existing concrete substrates, followed by the application of a 5,200 m² artistic mural across façades reaching up to 50 metres in height.
The painting works were carried out by rope-access technicians using 3,000 litres of organic finishing paint manufactured at a local production facility. Delivered as part of a weather-tight and watertight package and in accordance with a clean construction site approach, the works were carried out while the plant remained fully operational, with continuous coactivity and strict safety requirements associated with the ICPE-classified facility.