CH CHOLET IMAGE1.jpg

Refurbishment and extension of the emergency department at Cholet Hospital

  • FAYAT BÂTIMENT Pays de la Loire
  • Santé

Fayat Bâtiment Pays de la Loire is undertaking the refurbishment and extension of the emergency department at Cholet Hospital, marking a new stage in the modernisation of the city’s hospital infrastructure. This ambitious project aims to create modern reception facilities for the emergency department, alongside a medical centre.

Extension and refurbishment works

The project will begin with the demolition of 350 m² of modular buildings, including strip-out works and structural demolition, followed by the construction of a 500 m² extension. The extension will incorporate straight and curved in-situ concrete walls, together with solid concrete floor slabs and prestressed precast concrete floor units.

In parallel, 1,500 m² will be refurbished across three levels: a main ground floor housing facilities accessible to the public, a partial lower ground floor dedicated to the mobile emergency and resuscitation service (SMUR), and a first floor comprising meeting rooms and existing on-call bedrooms. Scheduled to last 25 months, the works will be carried out in four phases, allowing services to relocate progressively while maintaining uninterrupted emergency care.

 

 

CH CHOLET IMAGE.jpg

©ATAUB_ARCHITECTES

 

 

 

 

CH CHOLET IMAGE1.jpg

©ATAUB_ARCHITECTES

A technically demanding and carefully planned project

This project is particularly complex because the works are being carried out while the hospital remains operational, with emergency services maintained throughout. Rigorous planning and precise phasing allow services to relocate progressively as areas are refurbished, minimising disruption for medical staff and patients.

The project aims to create modern, functional spaces tailored to the needs of emergency care, while addressing the technical and safety requirements specific to a hospital environment. Valued at €1.6 million excluding VAT, the works present a significant technical challenge, combining expertise in structural works with compliance with the stringent standards of the healthcare sector.