Fayat Bâtiment Lorraine is carrying out the structural works for Studio 166, a residential development comprising 166 student accommodation units in Metz. The works cover all stages of structural construction, from the foundations to the reinforced concrete floors and walls, enabling the delivery of a weathertight building shell compliant with RE2020 regulations.

A structure designed to last

The project involves the construction of a four-storey building (ground floor plus three upper floors), with a floor area of 6,300 m², including 3,808 m² of usable floor space for the accommodation. The foundations were constructed using cast-in-situ screw displacement piles, embedded deep in the ground to ensure the stability of the building. The associated excavation works enabled the formation of the pile heads, the construction of foundation tie beams and the installation of underground services. The ground-floor slab was cast in reinforced concrete, incorporating separation from the underlying ground to limit stresses on the structure. The upper floor slabs, also cast in situ in reinforced concrete, provide structural strength, acoustic insulation and fire protection. The building’s vertical and horizontal structural framework comprises reinforced concrete columns, beams and walls, carefully constructed to ensure the transfer of loads to the foundations. Particular attention was paid to the concrete finishes to ensure both durability and aesthetic quality. The finishing elements included in the structural works package, such as staircases, window sills, thresholds and equipment plinths, were constructed in coordination with the main structure.

Résidence étudiante Studio 166 à Metz (57) 2
Résidence étudiante Studio 166 à Metz (57) 3

An environmental approach focused on energy performance

The works are being carried out in compliance with RE2020 regulations, ensuring optimal thermal performance and controlled energy consumption for the building.

The use of cast-in-situ reinforced concrete and screw displacement piles has helped reduce the environmental impact associated with the transport and storage of materials. Rigorous waste management and resource optimisation have been integrated into the planning and execution of the works, helping to limit the overall carbon footprint of construction.