TechnicAtome à Cadarache (13)

TechnicAtome in Cadarache (13)

  • BEC CONSTRUCTION Provence
  • Bureaux

Bec Construction Provence is constructing a new office building on the Cadarache site for TechnicAtome. The project is designed to increase the company’s capacity to accommodate its employees. The works are being carried out in a highly controlled-access environment, requiring successive entry through the CEA site and then the nuclear site, with strict safety and security procedures in place.

A technical organisation tailored to a highly constrained site

The building is being delivered through macro-packages covering all trades, including site installation and structural works, structural steelwork and roofing, waterproofing, metalwork, insulation and façade finishes, partitions, linings and suspended ceilings, internal joinery and fit-out works, as well as floor and wall finishes.

The structure is based on construction methods adapted to the specific requirements of the site, with close monitoring of the programme to ensure both safety and continuity of operations.

TechnicAtome à Cadarache (13)

A strong focus on performance and quality

Access restrictions and the specific procedures associated with the nuclear site require meticulous forward planning of workforce requirements, deliveries and site logistics. This organisation helps ensure compliance with the project schedule while meeting all regulatory and nuclear safety requirements throughout the construction phase.