Groupe scolaire Marcel Pagnol

Marcel Pagnol school complex: an exemplary reconstruction project on an occupied site

  • BEC CONSTRUCTION Provence
  • Enseignement

In Le Pradet (83), the teams of Bec Construction Provence, a Fayat Bâtiment subsidiary, carried out the complete reconstruction of the Marcel Pagnol school complex on an occupied site. The project involved the structural works and the construction of solid stone façades for the educational complex. This technically demanding operation was carried out in an urban environment, in close coordination with the local authority and partner companies.

A technically demanding and sustainable project

The works involved the construction of all reinforced concrete structures for the school complex, comprising 15 classrooms (six nursery school classrooms and nine primary school classrooms), a library, a physical activity room, a professional kitchen, two dining halls, administrative facilities and a multipurpose hall.
One of the project's distinctive features is the use of solid Provence limestone blocks (Estaillade stone), sourced from the Oppède quarry in the Vaucluse region. This traditional construction technique not only ensures long-term durability but also allows the school complex to blend harmoniously into the local landscape, providing an exceptional environment for children.
 

Groupe scolaire Marcel Pagnol
Groupe scolaire Marcel Pagnol

A project targeting BDM Silver certification and complying with RE2020

The project was designed and delivered in accordance with the latest environmental requirements. It is targeting Silver-level certification under the Bâtiment Durable Méditerranéen (BDM) scheme, with energy performance complying with the 2020 Environmental Regulations (RE2020).
This ambition was reflected from the design stage through the selection of locally sourced materials, including solid Provence limestone. The project's environmental strategy also included selective waste management, noise reduction measures and careful monitoring of resource consumption throughout the construction phase. These commitments were implemented in close coordination with all project stakeholders, following a low-impact construction approach that promotes the use of local resources.