The project involves the construction of a 366-space multi-storey park-and-ride facility, comprising a four-storey building with a total floor area of 12,000 m². The car park will support the rollout of an express bus service along a 21 km route, providing a smooth connection between Bordeaux and its surrounding areas and encouraging the use of more environmentally responsible modes of transport.
Beyond its public-service function, the project forms part of an ambitious environmental strategy. It aims to reduce CO₂ emissions by limiting the number of vehicles travelling into Bordeaux.

The facility stands out for its environmentally responsible construction approach, as it will be the second timber multi-storey car park in the Aquitaine region. Its main structure incorporates 585 m³ of FSC- or PEFC-certified timber sourced from the region, supporting sustainable forest management. This approach is combined with a dry construction system bringing together timber, concrete and steel, thereby helping to reduce the project’s carbon footprint.

The project also incorporates advanced construction techniques, including:
- Composite steel-timber-concrete floor systems, combining strength with lightweight construction.
- Integrated seismic design requirements.
- A PEIKKO construction system for the entrance and exit ramps, based on fully prefabricated concrete components, helping to optimise both construction schedules and execution quality.
With this innovative infrastructure, Cari Aquitaine is taking another step forward towards greener, more efficient construction.

