Modernisation de l’IGH de l’Hôpital Nord à Marseille 1

Modernisation of the High-Rise Building at Hôpital Nord in Marseille (13)

  • CARI Méd
  • BEC CONSTRUCTION Provence
  • FBEI
  • Santé

Bec Construction Provence, Cari Méd and FBEI are working in synergy to deliver the first phase of the modernisation programme for the Hôpital Nord high-rise building on behalf of AP-HM. This all-trades construction project involves bringing the building up to current safety standards and carrying out a comprehensive restructuring programme within an operational hospital environment.

Restructuring and technical modernisation of the high-rise building

Phase M1 of the project includes the complete restructuring of the office and consultation floors, the extension of the ground floor and the refurbishment of the upper technical areas of the high-rise building, originally constructed in 1964.

The works include upgrading the vertical technical service routes, creating new service shafts on the north façade, as well as modernising the lifts and installing two external towers accommodating goods lifts and patient lifts.

The demolition of the Swiss chalet structure on the top level, the refurbishment of Level 12 and the renovation of the Level 13 terrace are also included within the scope of works.

Finally, the ground-floor extension, roof refurbishment and adaptation of the existing façades complete the modernisation of the building envelope, bringing the high-rise building into line with current functional and regulatory standards.

Modernisation de l’IGH de l’Hôpital Nord à Marseille 2

Environmental performance and sustainable synergies

The project incorporates BDM Silver-level environmental standards for both the ground-floor extension and the refurbishment of the existing floors, helping to optimise the building’s thermal insulation, ventilation and energy systems.

Construction waste management and material sorting have been organised jointly by the Fayat Bâtiment entities involved in the project, reducing the environmental impact of the works while helping to extend the service life of the high-rise building.