A phased transformation of the site
The project is being carried out in several successive phases, each contributing to reshaping the port's identity. The first phase involved the restructuring of a fishermen's village covering an area of 1,570 m². The facility includes 18 enclosed storage units of 4.8 m² each for fishing equipment, 18 additional storage units for fishing net crates, four sales stalls, an ice-making machine room, a secure entrance gate, refurbished sanitary facilities and a cash machine.
The subsequent phases focus on the construction of a semi-underground car park providing 414 spaces for passenger vehicles and 36 surface-level parking spaces for buses. The installation of secant piles provides ground retention and defines the excavation perimeter. A capping beam is then constructed to accommodate the struts, ensuring resistance to horizontal loads. At the same time, groundwater is managed through six pumping wells, allowing the excavation area to be dewatered. The extracted water is treated in a settlement tank before being discharged into the natural environment.
The project also includes the construction of a new harbour master's office and the creation of a harbour basin enabling the partial resumption of vessel careening and maintenance activities. All works will be carried out while maintaining the continuity of port operations. Finally, the quaysides and pedestrian walkways will be completely redesigned to provide port users with a modern, functional and accessible environment. The project is being delivered in synergy with other FAYAT Group companies, including Satelec and Fayat Fondations.
A strong commitment to environmental protection
The Quai Laubeuf project follows a rigorous environmental approach, governed by the prefectural order of 26 December 2024 granting environmental authorisation for the project due to its impact on the marine environment. Several measures have therefore been implemented to prevent pollution risks and minimise the impact on the ecosystem.
Silt curtains have been installed to prevent the dispersion of suspended solids in the water. Pollution control kits suitable for both land and marine environments are deployed across the site, while a dedicated washing area has been provided for concrete skips. The storage of chemical products is also subject to strict controls.
The use of environmentally friendly, plant-based formwork release oil further demonstrates the project's responsible approach. Finally, rigorous environmental monitoring is carried out using noise measurement equipment and water turbidity sensors, enabling real-time monitoring of the environmental disturbances generated by the works.