réemploi matériaux construction

Construction material reuse: how Fayat Bâtiment is building more sustainably

Construction material reuse consists in giving products and equipment a second life in their original function in order to reduce waste, preserve natural resources and lower the carbon footprint of buildings.

As a key driver of low-carbon construction, reuse forms part of a broader approach aimed at improving the environmental performance of projects, from design through to construction.

At Fayat Bâtiment, reuse is considered from the earliest design stages. By combining life cycle assessments, eco-design principles and the recovery of existing resources, our teams support clients and project owners in delivering buildings that use fewer resources, are more sustainable and meet both current and future environmental requirements.

Why has construction material reuse become essential in the building sector?

The building sector generates 46 million tonnes of waste every year, representing nearly 19% of all waste produced in France (French Ministry for Ecological Transition). Yet today, less than 1% of these materials are reused.

In response to decarbonisation targets, material reuse is one of the most effective ways to limit the extraction of new resources and reduce the environmental impact of construction projects.

Key benefits of material reuse

Benefit Impact
Waste reduction Fewer materials sent for recovery or disposal
Lower carbon emissions Reduced need to manufacture new materials
Resource conservation Reduced extraction of raw materials
Low-carbon construction Contribution to RE2020 targets, our CSR strategy and our Empreinte 2030 strategic plan

How does Fayat Bâtiment integrate material reuse into its projects?

Material reuse is not simply about recovering a few materials at the end of a construction project. It is a comprehensive approach involving design, construction and environmental teams from the earliest stages of a project.

Sarah Leboulair, Head of Fayat Bâtiment's F2E department
EXPERT INSIGHT
“Today, demand for material reuse is expanding across our construction sites: sanitary equipment, washbasins, taps, paving stones, lighting fixtures, roofing zinc, guardrails, raised access floors... We are even seeing steel structures being reused. This means identifying the right source of materials at the right time, storing them and testing them to ensure that all the required guarantees are in place. ”
Sarah Leboulair Head of the F2E department
Fluids, Energy and Environment
Discover F2E expertise →

This approach is based on three key principles.

01 — Rethink design

Our teams work through co-design with architects, engineering consultancies and clients to identify, from the design stage onwards, which materials can be retained or reused.

02 — Assess impacts

Technical decisions can be supported by Life Cycle Assessments (LCA) to compare different solutions and identify the best balance between environmental impact, technical feasibility and whole-life cost.

03 — Ensure safe and compliant reuse

Each material is assessed, inspected and traced to ensure compliance with technical and regulatory requirements.

Which materials can be reused?

A wide range of construction materials and products can be given a second life, provided their condition allows it: doors and joinery, sanitary equipment, metal guardrails, paving stones and slabs, raised access floors, lighting fixtures and steel structures.

Today, the potential for reuse also extends to technical equipment, finishes, built-in furniture and, depending on the project, certain structural components.

récupération de matériaux de construction

How does a project incorporating material reuse work?

The success of a reuse project depends above all on careful planning. Our teams generally follow four key steps.

1
Identify available material sources that can be retained, using the PEMD diagnostic assessment (Products, Equipment, Materials and Waste, commissioned by the client) or equivalent assessments, as well as through our partner networks.
2
Assess their condition, performance and compatibility with the future building.
3
Organise careful removal, storage and transport of the materials under suitable conditions.
4
Ensure full traceability of each material through to its reinstallation in order to guarantee compliance.

This approach helps secure both the technical aspects of reuse and the associated insurance requirements.

Project example: material reuse at 35 Boulevard des Capucines in Paris

Reclaimed construction materials

The office renovation project at 35 Boulevard des Capucines in Paris provides a concrete example of the approach developed by Fayat Bâtiment.

HQE Sustainable Building BBC Effinergie Renovation BBCA Low-Carbon Building
Discover the project →

Four key levers were implemented.

01 — Preserve the existing structure

The building structure was preserved wherever possible to avoid unnecessary demolition and retain the embodied carbon already stored within the building.

02 — Reuse materials

Several components recovered from another building were incorporated into the project:

Sanitary equipment Doors Exposed aggregate slabs Wrought-iron guardrails Lighting fixtures Raised access floors

03 — Assess the impacts

The design teams and Fayat Bâtiment Études & Ingénierie (FBEI) carried out Life Cycle Assessments to guide each construction choice towards the solution with the best environmental performance.

04 — Adapt construction methods

The construction team worked without a crane while retaining the existing slabs and raft foundation. This approach avoided the need for new foundations, micropiles and the associated excavation works.

− 20%
Carbon performance improved by 20% compared with the project's reference level.

What do regulations say about material reuse?

The development of reuse is supported by several regulatory developments.

  • The AGEC Law promotes the circular economy in the construction sector.
  • The PEMD diagnostic assessment helps identify products, equipment and materials that can be reused before certain demolition or renovation projects.
  • The EPR scheme for construction products and materials (REP PMCB) notably sets a target of 5% reused materials by 2028.
  • RE2020 recognises the benefits of reused materials when calculating the Life Cycle Assessment of buildings.

These developments are gradually strengthening the role of reuse in both construction and renovation projects.

Material reuse requires expertise in environmental engineering, design, construction methods and carbon assessment.

Through its F2E (Fluids, Energy and Environment) department, Fayat Bâtiment Études & Ingénierie (FBEI) and its operational teams, Fayat Bâtiment supports clients in incorporating reuse from the project design stage onwards.

This approach helps optimise the environmental performance of buildings while ensuring technical quality, effective risk management and regulatory compliance.

FAQ – Construction material reuse

 

  • These concepts are often confused.

    Reuse: the material retains its original function without significant transformation.

    Repurposing: the material is used for a different purpose.

    Recycling: the material is processed to manufacture a new product.

    Reuse generally delivers the best environmental performance, as it preserves the value of the existing product while avoiding additional industrial processing.

  • Yes, provided they are properly assessed, qualified and traceable.

    The use of reused materials does not alter the contractor’s legal responsibilities. Guarantees relating to completion, proper functioning and ten-year liability continue to apply. This is why each material is selected, inspected and documented before being reused.

  • Yes. RE2020 recognises the use of reused materials when calculating a building’s Life Cycle Assessment (LCA). Their use therefore helps reduce the overall carbon impact of projects and supports the achievement of environmental performance targets.

  • Yes. Material reuse does not change the contractor’s responsibilities. If the component concerned falls within the scope of the ten-year guarantee, this guarantee continues to apply, including when reused materials are involved.

    Insurance coverage is subject to a certification process carried out by a qualified body, as well as confirmation from the insurer that the techniques used are considered standard practice.

  • The cost depends on the objectives and constraints of each project. While some reused materials may generate savings, reuse can also involve removal, inspection, storage and transport operations.

    Its value must therefore be assessed by considering both the carbon-to-cost ratio and the overall project cost, while factoring in the associated environmental benefits and waste reduction.

  • The main challenges relate to the availability of suitable material sources, logistics, traceability, technical inspections and coordination between the different project stakeholders.

    Planning for reuse from the design stage is essential to overcoming these challenges. The client’s commitment and active involvement in supporting reuse can also influence the success of the approach and its final cost.

  • Reuse makes it possible to retain materials that have already been manufactured without restarting an industrial production process.

    It therefore helps reduce greenhouse gas emissions, preserve natural resources and limit waste — three major priorities for sustainable construction.

EMAIL ALERT

Haven’t found a job opportunity matching your search?